Composition of electrical system
·Main electrical control cabinet: used for centralized control and protection of the entire electrical system, equipped with components such as frequency converters, motor protectors, contactors, relays, circuit breakers, etc., to ensure the stable operation of the electrical system.
·Drive motors: The drive motors for garbage cranes, ash cranes, or steam turbine cranes include lifting motors, translation motors, and walking motors.
·Frequency converter: The frequency converter is used to adjust the speed of the motor, and by changing the working frequency of the motor, it can achieve precise control of the movement speed of the garbage crane, ash crane, or steam turbine crane, ensuring smooth operation of the crane.
·Operating seat and control system: used for operators to control the lifting, translation, and start stop functions of garbage cranes, ash cranes, or steam turbine cranes.
·Sensors and monitoring system: including weight sensors, encoders, etc., real-time monitoring of the working status and load situation of the garbage crane to ensure its safe operation.
·Remote control system: The electrical system of the garbage crane is equipped with a remote control system, allowing operators to monitor and operate the garbage crane through remote terminal devices such as computers and mobile terminals.
·Cable and connection system: used to connect various electrical equipment, sensors, and control systems to ensure the normal transmission of signals and power supply.
Working Principle
·Start control: When the operator issues a command through the control panel or remote control, the control system will start the motor through electrical components such as contactors and relays, causing the garbage crane, ash crane, or steam turbine crane to start working.
·Lift control: Adjust the speed of the lifting motor through a frequency converter to control the lifting action of the garbage crane, ash crane, or steam turbine crane.
·Translation control: The translation motor controls the horizontal movement of the garbage crane along the track. The electrical system will adjust the operating speed of the motor based on load, track conditions, and other factors.
·Load detection: Detect the weight of the lifted load and the status of the grab bucket through a weight sensor. If the load exceeds the limit, the system will issue an alarm and automatically shut down to avoid overload accidents.
·Remote monitoring and fault diagnosis: Through the remote control system, the electrical system can provide real-time feedback on the working status and fault information of the garbage crane to operators or maintenance personnel, ensuring timely response and maintenance.