Project Overview:The construction of the Domestic Waste Incineration and Power Generation Project in Xihe County, Longnan City covers an area of 43.45 mu.The total investment is 353 million yuan.,The construction period is two years.The total scale of domestic waste treatment is 800 tons per day. Among them, in the first - phase, the daily treatment capacity of domestic waste is 500 tons, and the co - disposal capacity of kitchen waste is 40 tons per day.It is estimated that the annual treatment capacity of domestic waste will be 182,500 tons and that of kitchen waste will be 14,600 tons. The annual power generation will be 64.083 million kWh, the on - grid power will be 53.823 million kWh, and the annual oil recovery will be 333.3 tons.

AFMT provides for this project:2 setsWaste cranes, model QZLY11t - 27.7m - A8 - 6.3M³; 1 setAsh and slag cranes, model QZLY5t - 7.6m - A8 - 3M³; 1 setSteam turbine cranes, model LH25/5t - 13.05m - A5.

After the project is completed, it will become a demonstration base for environmental protection education and visits, and will form a venous industrial park mainly focusing on solid waste treatment, effectively improving the urban environmental quality and contributing to the sustainable development of the county - level economy in Xihe County.